C
(Art. of
OFFICE OF SURVEYOR GENERAL
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED F
**
Rebuilding Mountain Lodge Victoria Peak.
PLAN OR DESCRIPTION.
In the Sieport sent in after the Typhoon of 1st October last
+
mus stated that ⋅ Mountain Lodge at the Victoria Peak
Trad do
injurs
$100 fo, of New Brich work?.
454144
491
25
75
21/0
561
tatiing dorms pacent Watlo clearing tirietis rebuilding and finding all new that may required.
16015. It sup! lating up Verandah Files and relaying,
fending
all nuc ones
Aquare
that it would be mussary to pull it all down within two feet of the pres also that all the Mat But houses and suvanto Quarters had been complete 500 Yd Cuber digging destroyed. As the Hot weather will shortly be setting in it becomes to put the House again in a habitable state. The whole of the Building must be pulled down as the Walls though twice the thickness necessary. Victoria are shatun from the Stinth to the Roof, a great portion of the Foo is untitled and the Doors, Windows and Homs have all received more. less injury. In addition to putting the Building again in a thorough state of repair it is propooeds to add on underground room as a a plow o refuge during Typhoons, a parapet will also be added to the Roof as the best means of preventing the Winds from getting under the Tiles and causing them to be brown off. Cross Walls will be added in place of the partitions which formerly divided the Rooms, this giving extra string th to the Building. The Bachelor's Quarters which shed will be built of Wood in a substantial manner co
accompanying Ilan, the other Out houses with be Matshids strongly secured with: Typhoon Ropes - The Cost of the Repairs and
Additiona
cedre
shorn
on
hedsfors
3528
681 60
@ 4°
64120
2 Courses
Tiles in Chunamon Roof. c. 13′′.. 170 Strun of 12" File trough Gutters
9" drains Pipes and digging.
45864
• 20.
34
8 34
119
50°.
20
b
© 20%,
240
567
350
40 Yd up! Chunam Floor.
Firing 3 Chimney Pieces and Grates
12 ft sup. 6" Stips
formerly in a Mat
the
27
370
18
600
都
26
"
2
are estimated at $9000. Provision for this sum will be made in the Seepplementary Estimates.
41 Hearths
5" Coping
6" Capping to Chimneys
Cube Rough Stonsins foundations
Chamfered, base to uprights
6 Sinti Stones
Cole ft framed, hard Woods in Trusses
147 Cubeft
@$2..
® 2/8
@342
34
@ 93
11580- 6112
48
7352
402
€ 325
C
675.
220 50
Formaid_243547
1435/47
Approved,
(Signed) R. G. MacDonnell
Governor.